Showing posts with label Commercial Building. Show all posts
Showing posts with label Commercial Building. Show all posts

Architectural Visualization Of Corporate Building Designs



Corporate Building Design


Corporate Building Design - A corporate structure is what we enjoy the most, as the possibilities in designing the structure is endless. Through our perspective exterior renderings, it is possible to see the shapes and volumes of the buildings conceived in the blueprints. Our only focus while conceptualizing a corporate structure is to make the big idea real with photo real production of 3D visuals and cinematic animation with unmatched value and service.


We are Offering Best Quality Of Services:

- 3D Corporate Building Architectural Visualization 
- 3D Corporate Government Building 
- 3D Corporate Building Cutsection 
- 3D Corporate Building Design 
- Corporate Building Exterior 
- Corporate Building Evening View 
- Corporate Building Night View 
- Corporate Building Birds Eye View 
- Corporate Building Interiors 
- Corporate Building 3D Walkthrough

Please do not hesitate take a FREE inquiry quote.


The Psychology behind Designing Corporate Spaces



Let’s be honest, designing corporate spaces is all about the bottom line. Traditionally companies would save money by buying the cheapest furniture possible – in bulk – and arranging it in an assembly line fashion to accommodate the largest amount of workers in the tightest space.


However, corporations are quickly discovering that this type of office configuration has a profoundly negative effect on worker performance. Research has also shown them that, by banishing the traditional model, their employees will work more productively and ultimately generate a greater profit.


The article below details the psychological effects behind these changes. Take a look at their effects, as well as the big name companies who have benefited doing a little rearranging. You may even find yourself changing your own workspace up a bit.


Psychology students at the University of Exeter put that theory to the test when they studied a local corporation. They divided the workers into four groups: one group was not allowed to personalize their cubicles at all, one that was allowed to decorate walls without reconfiguring furniture, one allowed to reconfigure however they pleased, and a final group that was given the freedom to decorate but eventually forced to conform to rules.


Unsurprising, the group that was able to reconfigure their cubicles however they wished showed the most positive outcome. They reported improved concentration, ambiance, organization, and productivity.


Call & Whatsapp on: 

+91 9372032805,
+91 8975253200

Find us on Social Network

Facebook : https://www.facebook.com/threedpower
Twitter : https://twitter.com/3DPower
Google+ : https://plus.google.com/+threedpower
Youtube : https://www.youtube.com/user/3dpowerwalkthrough
pinterest : https://in.pinterest.com/3dpower/
Flickr : https://www.flickr.com/photos/threedpower/

For more details visit our website :
http://www.3dpower.in/

Elite Victoria Memorial


The Victoria Memorial was built to commemorate the peak of the British Empire in India. The Victoria Memorial, conceived by Lord Curzon, represents the architectural climax of Kolkata city. Lord Curzon, the then Viceroy specified its classical style but the actual plan of Victoria Memorial was laid down by the well-known architect, Sir William Emerson.


The Victoria Memorial blends the best of the British and Mughal architecture. The Victoria Memorial hall was built with white Makrana marbles. The Prince of Wales laid the foundation stone of Victoria Memorial in 1906 and it was inaugurated in 1921 in memory of Queen Victoria. The Victoria Memorial is 338 by 228 feet and a height of 184 feet. Today the Victoria Memorial Hall is a museum having an assortment of Victoria memorabilia, British Raj paintings and other displays. As night descends on Calcutta, the Victoria Memorial Hall is illuminated, giving it a fairy tale look.


It is interesting to note that the Victoria Memorial was built without British government funds. The money required for the construction of the stately building, surrounded by beautiful gardens over 64 acres and costing more than 10 million was contributed by British Indian states and individuals who wanted favours with the British government. At the top of the Victoria Memorial is a sixteen foot tall bronze statue of victory, mounted on ball bearings. It rotates with wind. At present the Victoria Memorial has notable collection of weapons, sculptors, paintings, maps, coins, stamps, artefacts’, textiles etc. The Royal gallery in Victoria Memorial has portraits of the Queen and Prince Albert. There are numerous paintings, illustrating events from Victoria's life.


Another remarkable peace in Victoria Memorial is a painting by the Russian artist Vasseli Verestchagin, portraying the state entry of the Prince of Wales in Jaipur in the year 1876. In the post independence period a new addition was made to the Victoria Memorial. It was the addition of the National leaders' gallery with the portraits and relics of the freedom fighters.
.

Prime Office Market Trends for 2015 in India



Investment-grade office space demand slowed down in the first quarter of 2015, with around 6.3 million sqft of Grade an office space getting absorbed across leading cities of the country. Transaction activity was dominated by the National Capital Region (NCR), Bangalore and Chennai. Special Economic Zone (SEZ) developments in Gurgaon, Bangalore, Hyderabad and Pune also saw traction during Q1 2015. The market saw slow transaction activity and a low level of new completions in the first quarter; and leading cities continued to experience caution from corporate occupiers in the first three months of the year. Most investments by PE groups in the sector during the period were structured debt deals, with a preference for residential projects or well-leased commercial projects. Land and/or development sites for residential and mixed-use projects in the peripheral locations of leading cities also attracted investor attention.



Since business sentiment had recovered slightly towards the end of 2015, it is expected to improve further following the General Elections results. Market demand is likely to pick up gradually. Occupiers will remain focused on optimal space utilization and cost savings. Peripheral and decentralized locations such as the NCR's Gurgaon and Bangalore's Whitefield will continue to experience strong demand. Office space occupiers from selected sectors such as IT/ITeS will cautiously expand, but only in small to medium sized spaces. Larger size requirements will likely remain limited to a few back-office expansions and consolidations alone.


Occupiers in the IT/ITeS, financial services, engineering, manufacturing, telecommunications and pharmaceuticals sectors will drive office demand. Back office space will continue to see high demand, while front office take-up will remain comparatively limited. The bulk of leasing activity will likely take place in peripheral and secondary locations—such as Gurgaon in the NCR, Whitefield and the Outer Ring Road in Bangalore, Lower Parel in Mumbai, and the secondary business districts of Chennai and Hyderabad. Significant supply of fresh office space expected to reach completion in the coming months is likely to push up vacancy levels, however, keeping rental values range bound.



Architecture of Office Building Designs


Even before the outset of design and construction of the Lewis and Clark State Office Building, the mission was clear: create a green office building and certify it to the highest level of LEED without overtaxing the credulity of the taxpayers in the “Show-Me States.” The modest budget, $18.1 million, was provided by the Missouri state legislature before the tenant, the Department of Natural Resources, had even put the sustainability goals on the table. But it was the writing on the wall that crystallized the building’s environmental goals.


“When we were interviewing for the project, we spent one afternoon in the state Capitol building reading inscriptions that are carved into a particular wall about the natural resources of the state,” says architect Steve McDowell, FAIA, of BNIM Architects. “We read about the minerals, animals, plants, rivers—all the natural things that were important to the character and nature of Missouri,” he says. “We thought we were already committed to the green agenda, but looking back at what was important to the founders and early citizens of the state influenced how deeply we held those values through the project.” That commitment was nurtured from the beginning of the process, when BNIM organized a design charrette that involved more than 100 people, representing all parties involved in the project”.


Not far from where Meriwether Lewis and William Clark embarked on their exploration of the American West in 1804, the building is a stone’s throw from the Missouri River. The 120,000-square-foot structure extends about 350 feet along the east-west axis, and only 70 feet from north to south, a ratio that was calculated to reduce energy costs and maximize interior daylight.
Choosing the site was integral to the project. “We started with some sites that we felt were unsuitable, because they were set out in the suburbs, for example, so we challenged our client to look for a more urban site,” says Kimberly Hickson, AIA, one of the project managers for BNIM. The state came back with 17 sites, including the one that was eventually chosen.
Constructed on the 144-acre site of the former Jefferson City Correctional Facility, eight blocks from downtown, the office building is one piece of an ambitious mixed-use urban redevelopment project. It took the place of a former women’s prison, with bricks from the prison being used for a number of interior surfaces.


In a landscape design based on xeriscape principles, indigenous grasses, shrubs, and trees have thrived despite a dry first year. Vegetated bioswales and topography that encourages stormwater infiltration help meet a goal of keeping runoff out of the municipal stormwater system. The landscaping is not without maintenance needs, but they are considerably less than in a conventional landscape. “We pull weeds from it. It has been mowed once,” says Dan Walker, director of the general services program for the Department of Natural Resources, who represented the tenant throughout design and construction. Nature trails around the site and reaching toward the river are planned.


Green features extend from the outside into the building. A 50,000-gallon cistern collects rainwater from the roof, which is filtered and used in flushing toilets. The system conserved 405,000 gallons in its first 13 months. One hundred and sixty-eight photovoltaic panels produce 21.5 kilowatts of power, or 2.5 percent of the building’s needs. Thanks in large part to a well-planned daylighting system and the careful design of the heating and cooling system, the building is predicted to use less than half of the energy of a comparable ASHRAE base model.


The narrow aspect ratio of the building, solar orientation, and both interior and exterior light shelves help daylight penetrate deep into the office space. Employees enjoy access to views and daylight at workstations that are located around the perimeter. Enclosed rooms are generally situated at the core. Many of the windows are operable, providing natural ventilation. Although the daylighting scheme went through computer modeling by ENSAR Group, which has since merged with the Rocky Mountain Institute’s Green Development Services, during part of the winter a gap between the interior canvas light shelves and the glazing causes glare in some workstations. A miscommunication with the fabricator led to the mistake, which wasn’t present in models, and the problem is being fixed in time for next winter.

The building design also keeps employees active. Amenities such as changing rooms and showers were created largely for those who bike to work, but also encourage occupants to exercise. A number of people jog during their lunch breaks, according to Walker, and some walk downtown for meetings. Nearly everyone uses the prominent and attractive stairs in the central atrium.
Although all of these features reduce operating costs and increase occupant satisfaction, the building team was still concerned that its construction budget would lead to compromises. At one point, the state balked at buying the low-emissivity glass specified by the architect, so the firm ran an energy model with a lower-cost alternative. “We found that we could spend the money on glass or we could spend it on a bigger mechanical system,” Hickson says, noting that the mechanical system would add energy and maintenance costs over the long run. The glass stayed. The engineer performed a similar analysis on the building’s aspect ratio when the client wanted a boxier profile; again, the analysis confirmed the efficiency of the design.

The project used an integrated design process, but owing to the requirements of competitive bidding, a contractor wasn’t involved early on. “I guess we were all somewhat nervous at the bid opening,” says Hickson. “We didn’t really know where it would fall.” The team received a low bid from a trusted contractor, although one without experience in green building. The contractor worked hard to meet the sustainability goals and helped the team gain LEED points in construction waste recycling and recycled content of materials, at a time when the project was on the edge of achieving Platinum. “There was a lesson there,” says Laura Lesniewski, AIA, BNIM’s project manager during the construction phase. “If you have someone who’s interested in learning, he doesn’t need to have prior experience.”


 Despite the project’s impressive achievement in the LEED rating system, the team gave up points along the way. It procured lumber from Missouri’s only certified sustainable forest for the atrium, but for the roof structure, which uses exposed glued laminated beams, the team couldn’t locate a product with certified content. It also hoped to earn a point for reducing the urban heat island effect with reflective roofing, but the emissivity level of the roof left them a fraction short of the requirement.
The team went to extra lengths to achieve some points, such as using furniture that meets indoor air quality (IAQ) standards. State agencies are required to purchase furniture manufactured through prison inmate vocational programs, so the team brought its sustainability agenda to the prisons, working to help them achieve Green guard Indoor Air Quality listing for its furniture.
“The building performs well and our occupants are extremely happy from the perspective of IAQ, lighting, and heating and cooling,” says Walker. Several occupants have reported better health in this building after having sinus problems in previous buildings, he adds. Walker has also noted reduced absenteeism, an observation the department plans to investigate by examining employment records.

By all accounts, the success of the project was based on the commitment to sustainability by the key members of the team. Built on budget, the building is also meeting financial performance expectations over the long term. “We did life-cycle costing on every aspect of the building, and so far things are on schedule,” says Walker.


Most Popular Corporate Building Design

AOL Head Quarters Mesmerises Palo Alto California


It’s no secret that AOL isn’t the company that is used to be, but they’re trying to make big changes with the purchase of websites such as Techcrunch and Huffington Post, and they’ve recently had a massive overhaul of their headquarters to suit.

They’ve gotten rid of the bland corporate facade and taken a leaf out of Google’s books and tried to make their office more fun and inspiring, with fresh new designs.

This office is everything you’ll come to expect from enormous internet companies with large kitchens, splashes of color, countless relaxation areas, pool tables, games rooms, and of course, the all important work spaces.







architectural 3d visualization and rendering company













3d Power has observed that the popularity of eco-friendly building grows every year and by keeping up on green building construction trends, your company’s revenue can grow with it. In 2015, energy efficiency, product transparency, and workload-lightening cloud technology should all be on your watch list.

Green renovations predominate — Demand for greening existing buildings stands to surpass demand for new eco-friendly constructions. This year alone, hundreds of government buildings are likely to be scheduled for upgrades with an eye toward gaining green building ratings.

Automated energy management attracts attention — One of several long-term green building construction trends, energy efficiency improvements are in ever-increasing demand. In 2015, cloud-based (web-based) systems that manage energy use are poised to play a greater role in meeting this demand.

Solar power surges forth — With an increase in the third-party financing options available, more owners of commercial and residential spaces will consider rooftop solar power systems.

Water awareness grows — The need to conserve water is no longer restricted to desert climates. Nationwide, reduced rainfall and dwindling freshwater reserves mean more property owners will be looking for convenient ways to save water.


Disclosure is in demand — To gain a competitive edge, more manufacturers will use Environmental Product Declarations (EPDs), Health Product Declarations (HPDs), red lists of chemicals and materials, and other transparency tools.

The cloud comes into its own — Designing and managing construction projects in cloud-based technology will soon be the norm. Now’s the time to get on board with the fast, efficient collaboration cloud computing enables.

LEED’s popularity slips — The U.S. General Services Administration (GSA) now recognizes a Two Globes certification from Green Globes to be equal to LEED Silver Certification. Many professionals will opt for the simpler, more affordable Green Globes over LEED.

Zero-energy goes mainstream — The ability to design zero-net-energy buildings will put you a cut above the average construction firm, right where you need to be to attract clients who are serious about minimizing their building’s energy demands.